Ceramic block house: floor slab and shell

A cast-in-place floor slab over the ground floor – rebar in two directions, pumped concrete, floating – and two months later the building with a roof.

Period
11.10.2022 – 25.12.2022
Entries
02
Photos
07

Scope on the diagramR-08

  1. FoundationsFoundations: not documented
  2. Reinforced concreteReinforced concrete: not documented
  3. WallsWalls: visible as finished
  4. Floor slabFloor slab: KMB work in the photos
  5. Roof structureRoof structure: not documented
  6. RoofRoof: visible as finished
  • KMB work in the photos
  • Visible as finished
  • Not documented

Site diary

2 entries · dates from company posts · 76 days in photos

  1. Entry 01/0211.102022 · day 1

    Floor slab over the ground floor

    Two layers of rebar mesh on the formwork, level checked with a levelling instrument, concrete placed by pump and power-floated.

  2. Entry 02/0225.122022 · day 76

    Shell with a roof

    Attic walls of ceramic hollow blocks, roof covered, roof windows installed.

Building
Single-family house
Period in photos
11.10.2022 – 25.12.2022
KMB work in the photos
floor slab
Technology
  • Ceramic hollow blocks
  • Cast-in-place floor slab
  • Pumped concrete
Photo source
KMB Konstrukcje, posts from the site