House by the forest: from setting out to walls
Setting out with batter boards and string lines, excavation, strip footings poured by pump in the first snow, and after the winter, ground-floor walls of sand-lime blocks.
- Period
- 17.11.2021 – 28.02.2022
- Entries
- 03
- Photos
- 12
Scope on the diagramR-03
- FoundationsFoundations: KMB work in the photos
- Reinforced concreteReinforced concrete: not documented
- WallsWalls: KMB work in the photos
- Floor slabFloor slab: not documented
- Roof structureRoof structure: not documented
- RoofRoof: not documented
- KMB work in the photos
- Not documented
Site diary
3 entries · dates from company posts · 104 days in photos
- Entry 01/0317.112021 · day 1
Setting out and excavation
Batter boards with string lines around the building outline, a mini excavator digging trenches for the strip footings.
- Entry 02/0330.112021 · day 14
Footings poured by pump
Rebar in the trenches, concrete placed by pump, spread and compacted – despite the snow.
- Entry 03/0328.022022 · day 104
Ground-floor walls
The first course of blocks levelled on mortar, then external and partition walls of sand-lime blocks, with lintels over the openings.
- Building
- Single-family house
- Location
- Period in photos
- 17.11.2021 – 28.02.2022
- KMB work in the photos
- foundations, walls
- Technology
- Reinforced concrete strip footings
- Pumped concrete
- Sand-lime blocks
- Photo source
- KMB Konstrukcje, posts from the site