A-04 · ProjectsR-01 · Single-family house
Sand-lime block house with a truss roof
Sand-lime block walls with ring beams in formwork, then the roof: prefabricated trusses lifted by a truck-mounted crane (HDS) straight from the trailer and set on the wall plate in one day.
- Period
- 09.08.2021 – 19.08.2021
- Entries
- 03
- Photos
- 07
Scope on the diagramR-01
- FoundationsFoundations: not documented
- Reinforced concreteReinforced concrete: not documented
- WallsWalls: visible as finished
- Floor slabFloor slab: not documented
- Roof structureRoof structure: KMB work in the photos
- RoofRoof: not documented
- KMB work in the photos
- Visible as finished
- Not documented
Site diary
3 entries · dates from company posts · 11 days in photos
- Entry 01/0309.082021 · day 1
Walls and ring beams
Walls built, yellow ring beam formwork on top of the walls. Inside: stairs and partition walls.
- Entry 02/0315.082021 · day 7
Trusses on site
Prefabricated trusses delivered to the plot – laid out next to the building, ready to be lifted onto the roof.
- Entry 03/0319.082021 · day 11
Roof structure in one day
Trusses lifted by the truck-mounted crane (HDS) from the trailer and set one by one on the wall plate, together with the porch trusses at the front. Photos from the same day show the whole roof structure already in place.
- Building
- Single-family house
- Location
- Period in photos
- 09.08.2021 – 19.08.2021
- KMB work in the photos
- roof structure
- Technology
- Sand-lime blocks
- Reinforced concrete ring beams
- Prefabricated roof trusses
- Truck-mounted crane (HDS)
- Photo source
- KMB Konstrukcje, posts from the site
- Sheet
- R-01