A-04 · ProjectsR-06 · Industrial hall · Kobierzyce

Walls in an industrial hall

Building tall walls of aerated concrete blocks inside a steel hall – working from scaffolding, with a reinforced concrete core column in the wall.

Period
15.04.2022 – 19.04.2022
Entries
02
Photos
02

Scope on the diagramR-06

  1. FoundationsFoundations: not documented
  2. Reinforced concreteReinforced concrete: not documented
  3. WallsWalls: KMB work in the photos
  4. Floor slabFloor slab: not documented
  5. Roof structureRoof structure: not documented
  6. RoofRoof: not documented
  • KMB work in the photos
  • Not documented

Site diary

2 entries · dates from company posts · 5 days in photos

  1. Entry 01/0215.042022 · day 1

    Bricklaying from scaffolding

    The crew on two scaffolds builds the wall up to the height of the roof structure. The post was tagged with the location: Kobierzyce, LG Energy Solution Wrocław.

  2. Entry 02/0219.042022 · day 5

    Wall up to the roof

    The wall built up to the roof sheeting, pallets of aerated concrete blocks on the hall floor.

Building
Industrial hall
Location
Kobierzyce
Period in photos
15.04.2022 – 19.04.2022
KMB work in the photos
walls
Technology
  • Aerated concrete blocks
  • Reinforced concrete core column
  • Scaffolding
Photo source
KMB Konstrukcje, posts from the site
Sheet
R-06