Strip footings poured by pump
The day before Christmas Eve: excavation for the footings, a concrete mixer truck and a pump on site, footings poured all around the building.
- Period
- 23.12.2021
- Entries
- 01
- Photos
- 05
Scope on the diagramR-05
- FoundationsFoundations: KMB work in the photos
- Reinforced concreteReinforced concrete: not documented
- WallsWalls: not documented
- Floor slabFloor slab: not documented
- Roof structureRoof structure: not documented
- RoofRoof: not documented
- KMB work in the photos
- Not documented
Site diary
1 entry · dates from company posts · 1 day in photos
- Entry 01/0123.122021 · day 1
Excavation and pouring the footings
An excavator finishes the trenches, a mixer truck with a pump places concrete into them, footings poured along the whole building outline.
- Building
- Single-family house
- Location
- Period in photos
- 23.12.2021
- KMB work in the photos
- foundations
- Technology
- Reinforced concrete strip footings
- Pumped concrete
- Photo source
- KMB Konstrukcje, posts from the site
- Sheet
- R-05