Strip footings poured by pump

The day before Christmas Eve: excavation for the footings, a concrete mixer truck and a pump on site, footings poured all around the building.

Period
23.12.2021
Entries
01
Photos
05

Scope on the diagramR-05

  1. FoundationsFoundations: KMB work in the photos
  2. Reinforced concreteReinforced concrete: not documented
  3. WallsWalls: not documented
  4. Floor slabFloor slab: not documented
  5. Roof structureRoof structure: not documented
  6. RoofRoof: not documented
  • KMB work in the photos
  • Not documented

Site diary

1 entry · dates from company posts · 1 day in photos

  1. Entry 01/0123.122021 · day 1

    Excavation and pouring the footings

    An excavator finishes the trenches, a mixer truck with a pump places concrete into them, footings poured along the whole building outline.

Building
Single-family house
Period in photos
23.12.2021
KMB work in the photos
foundations
Technology
  • Reinforced concrete strip footings
  • Pumped concrete
Photo source
KMB Konstrukcje, posts from the site
Sheet